ORE TERMINAL CONSTRUCTION
2008-08-12 11:29:15    浏览模式:【 】字号 【繁体
chineseport.cn友情提示:如您看到当前这段话,可能是网速较低;或者是因为你现在使用的浏览器版本过低,不支持当前网站正常浏览及功能使用,请换高版本的浏览器。您可使用最新版本的IE浏览器(如IE11,IE7.0以下老版本将无法兼顾支持)、火狐浏览器(firefox46.0)、谷哥浏览器、360浏览器等浏览本网,以获得更好浏览体验。
  INTRODUCTION OF THE PROJECT   One 250,000 DWT ore terminal and one 150,000 DWT ore terminal will be constructed at the north side of the planned 300,000 DWT oil terminal. The storage yard back side the ore terminals will be over 300,000 square meters, with the annual throughput capacity over 40,000,000 tons.   The ore terminals are 20 km away from Weihai City center. The original land is flat and plain, which can ensure a safe and reliable project at a low building cost but at a high construction speed. The inner port railway has been set up, and has been connected with national highway network, which offers a fast and convenient through transportation system.   SCALE OF THE PROJECT   One 250,000 DWT terminal and one 150,000 DWT terminal. They are exclusively used for the ore.   COOPERATION MODE   Joint Venture or other cooperation way, which is negotiable.   INTRODUCTION OF THE COMPANY   Weihai Port Group Co., Ltd. is one large state-owned enterprise, which is directly under the administration of Weihai City Government. It has 4 stock holding sub-companies and 5 stock sharing sub-companies, responsible for the construction, operation, and development of Weihai port. In 2007, Weihai port achieved the revenue of 220,000,000 RMB, with total asset of over 1,300,000,000 RMB.   CONTACT WAY   PIC: MR TANG ZONGLING     Email: tzl@weihai.gov.cn   Tel: 0631-5166696   Fax: 0631-5166696
chineseport.cn友情提示:如您看到当前这段话,可能是网速较低;或者是因为你现在使用的浏览器版本过低,不支持当前网站正常浏览及功能使用,请换高版本的浏览器。您可使用最新版本的IE浏览器(如IE11,IE7.0以下老版本将无法兼顾支持)、火狐浏览器(firefox46.0)、谷哥浏览器、360浏览器等浏览本网,以获得更好浏览体验。
 
Tags:  
】【打印繁体】【投稿】【收藏】 【推荐】【投诉】【评论】 【关闭】 【返回顶部
分享到: 
上一篇:威海港原油仓储、中转罐区合作项目 下一篇:威海港矿石码头建设合作项目

相关栏目

最 新

推 荐